Jiangxi Tianming Uses AceTimesheet to Track R&D Hours and Costs per Project

Nov 20, 2026
Jiangxi Tianming Uses AceTimesheet to Track R&D Hours and Costs per Project

Many product R&D companies face the same three problems. The first is that attendance and timesheets are two separate things — DingTalk clock-ins prove a person showed up, but not which project they worked on that day. The second is that quoting and post-project review lack a factual basis: development hours for a new project are estimated, and after the project closes nobody can produce the actual input, so the next project is estimated again. The third is the most hidden: R&D cost allocation requires an evidence chain. Super-deduction and high-tech enterprise re-certification both ask the same question: who spent how many hours on which project, and where does that number come from? These are exactly the core problems solved by the AceTimesheet R&D timesheet management system, whose positioning is — R&D project timesheet statistics, labor cost accounting, and compliant R&D cost allocation.

In the R&D center of Jiangxi Tianming New Energy Vehicle Parts Co., Ltd., the more projects there are, the more fragmented people's time becomes. One structural engineer carries three or four projects at once: on Monday he joins the design review for Project A, on Tuesday he does simulation benchmarking for Project B, and on Wednesday he is called in to do technical estimates for Project C's quotation. When filling in timesheets at month-end, he can only rely on memory to spread the days across projects — and after that, nobody can say clearly which project actually consumed how much manpower.

To sort out these three issues, the customer chose the “AceTimesheet R&D timesheet system platform and solution”. During selection they compared several options: HR attendance software, timesheet plug-ins in general project management tools, and Excel plus manual consolidation. The conclusion was that these tools answer “is the person there” and “is there a lot of work”, but not “which project did the money go to, and can this number stand up to an audit”. AceTimesheet is positioned for the latter — R&D project timesheets and labor cost accounting.

Three things in implementation

First, set the granularity at three levels: project, task, and person. Hours do not stop at “100 hours on a certain project” but land on specific tasks: structural design, CAE simulation and benchmarking, process development, drawing and BOM release, engineering change handling. People running several projects in parallel allocate by task, not by splitting the month evenly.

Second, connect timesheets with DingTalk attendance for validation. If attendance duration and reported hours do not match, the system flags an exception. This solves the credibility problem — data is not simply accepted once submitted; another link in the chain is always watching.

Third, convert hours directly into labor cost. Each person's cost rate goes into the system, and multiplied by project hours, how much labor cost a project consumed becomes a ready-made result. What the R&D leader gets is not “who is busy” but “what this project's labor cost is”.

The change did not happen overnight. The most direct one is that reporting shifted from “catching up at month-end” to “recording it the same day”; later, hours that nobody used to account for — customer technical exchanges, supporting other project teams with validation work, technical estimates for sales quotations — began to appear in project costs. R&D cost allocation now has traceable records, with no need to fill in forms after the fact.

Next step: hand entry and queries to AI

AceTimesheet's new release pushes this path further. The new version supports the MCP protocol, so timesheet data can be called directly by AI Agents and other systems, with projects, tasks, and durations identified automatically; it also supports a digital twin, where missed hours are reminded, completed, and summarized in the background by the twin — meeting IPO and regulatory requirements with full-chain traceability.

For an auto parts company whose processes are still evolving, R&D investment that cannot be calculated is more troublesome than investing a lot. Now, when the R&D leader looks at a new project, the first thing they check is the labor cost column — and they have solid ground when quoting.

Note: If any images, words, or statements in this article infringe on rights, please contact us for removal.

Copyright © This article was compiled, written, and published by the AceTeamwork team. For reprints, please cite the source: 「AceTeamwork」.

Want this running for your team?

Book a demo — we will walk through how similar customers in your industry rolled it out.